Search
Now showing items 1-10 of 51
Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. I - Summary Report
(2006-10-30)
The TERP legislation adopted the energy efficiency provisions of the International
Residential Code (IRC) and the International Energy Conservation Code (IECC) for
residential, commercial and industrial buildings. Under ...
Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I – Summary Report, Annual Report to the Texas Commission on Environmental Quality September 2002 – August 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
The Energy Systems Laboratory (Laboratory) is pleased to provide our second annual report, Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan to the Texas Council on Environmental Quality (TCEQ) ...
Energy Efficiency / Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. II – Technical ReportAnnual Report to the Texas Commission on Environmental Quality, Sept. 2003 to Aug. 2004
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2004)
The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. § 388.003 (e), Vernon Supp. 2002, submits its third annual report, Energy Efficiency/Renewable Energy (EE/RE) ...
Energy Savings Assessment for the Robert E. Johnson State Office Building in Austin, Texas
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
U.S. businesses and institutions spend an
estimated $175 billion per year for energy. Of that, the
fraction under performance contracts and energy
service agreements is currently growing, aided by
cheaper monitoring ...
Energy Efficiency / Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. I – Summary ReportAnnual Report to the Texas Commission on Environmental Quality, Sept. 2003 to Aug. 2004
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2004)
The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. § 388.003 (e), Vernon Supp. 2002, submits its third annual report, Energy Efficiency/Renewable Energy (EE/RE) ...
Program Overview: The Texas LoanSTAR Program; 1989-August 1997
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
The Texas LoanSTAR mans to Save Taxes
and Resources) program was conceived as a $98.6
million capital retrofit program for building energy
efficiency. The funding source is petroleum violation
escrow funds (PVE) from the ...
Development of Baseline Monthly Utility Models for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1996)
The Fort Hood Army base in central
Texas has more than 5,200 buildings and can be
considered as typical of large Department of
Defense Army bases in the continental United
States. The annual utility bill of the base ...
Environmental Impact of the Texas LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
This paper presents an analysis of the
environmental impact of the energy reductions that
have been measured in the Texas LoanSTAR
program. There are a number of factors that
influence emission factors. The three major ...
Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. II - Technical Report
(2006-11-01)
The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. § 388.003 (e), Vernon Supp. 2002, submits its fourth annual report, Energy Efficiency/Renewable Energy (EE/RE) ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...