Search
Now showing items 41-50 of 85
Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Preliminary Engineering Survey, USDOE Forrestal and Germantown Facility, Summary Report, USDOE Office of Conservation and Energy
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The purpose of this preliminary engineering survey of the USDOE Forrestal and Germantown
facilities is to determine whether existing EMCSs can be used for monitoring energy retrofits, and in
the case where this is not ...
Rebuild America Program – Brazos Valley Energy Conservation Coalition – Quarterly Report for July – September 1998
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
The Brazos Valley Energy Conservation Coalition (BVECC), administered by the Energy Systems Laboratory (ESL) of Texas A&M University, in College Station, Texas received notification of the U.S. Department of Energy ...
Lessons Learned from Continuous Commissioning® of a LEED Gold Building in Texas
(2008-09-22)
The subject building is a relatively new building with 120,000 square feet located in Texas and was the first LEED® Gold building in the area. To earn the title of a green building, the designers of this high performance ...
Retrospective Testing of an Automated Building Commissioning Analysis Tool (ABCAT)
(Energy Systems Laboratory, 2009-01)
More than $18 billion of energy is wasted annually in the U.S. commercial building sector. Commissioning services have proven successful in reducing building energy consumption, but the optimal energy performance obtained ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002
(2002-12)
This report presents electricity, natural gas and cooling baselines for the thermal plant,
buildings located in the 87000 block, and the III Corp building at Ft. Hood. A baseline
analysis is also presented for the natural ...
Savings Analysis of Utility Bills for Unmonitored Sites, Volume II: Detailed Savings Calculations, Texas LoanSTAR Monitoring and Analysis Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
Detailed calculations for each site are shown in this Volume. For each site the ECRM description, approved loan amount, expected savings, the pre and post-retrofit energy use (electricity and gas separately), cost of energy, ...
Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Final Summary Report for USDOE Office of Conservation and Energy, Final Revision, March 1993
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Traditionally, Energy Management and Control Systems (EMCSs) have been used to control
HVAC, lighting, fire and security systems in buildings. Few EMCSs are used for long term
trending and analysis of energy use (i.e., ...
Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at Texas A&M University -- Corpus Christi (TAMU-CC) Corpus Christi, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The physical plant director and staff at Texas A&M University-Corpus Christi (TAMUCC) do a very good job of maintaining TAMU-CC and keeping expenses down. During our visit, however, we were able to identify several ...
Retrofit Savings for Brazos County
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2001)
This report presents the energy and dollar savings for the period May 2000 - April 2001 for 10 of the Brazos County facilities that have been retrofit. The electricity use saved was 555,170 kWh and the demand was 1062 kW, ...
Development of Baseline Monthly Utility Models, Stabilization of Data Logging Environment and Development of Metering Plan and Shopping List for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (CERL) located at Champaign, IL. The report describes the work performed by the Energy Systems Laboratory (ESL) of ...