Visit the Energy Systems Laboratory Homepage.
Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Preliminary Engineering Survey, USDOE Forrestal and Germantown Facility, Summary Report, USDOE Office of Conservation and Energy
Abstract
The purpose of this preliminary engineering survey of the USDOE Forrestal and Germantown
facilities is to determine whether existing EMCSs can be used for monitoring energy retrofits, and in
the case where this is not practical, to recommend a LoanSTAR- type monitoring system for this
purpose. This preliminary engineering survey reports on the preliminary findings of a survey
conducted at the USDOE Forrestal and Germantown facilities during March 27- 29,1991.
The monitoring points contained in this report are subject to verification during the Detailed Design
Task. Final cost estimates will be submitted upon completion of the Detailed Design Budget.
Collections
Citation
Claridge, D. E.; Haberl, J. S.; Bryant, J.; Poyner, B.; McBride, J. (1991). Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Preliminary Engineering Survey, USDOE Forrestal and Germantown Facility, Summary Report, USDOE Office of Conservation and Energy. Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University; Department of Mechanical Engineering, Texas A&M University. Available electronically from https : / /hdl .handle .net /1969 .1 /2096.