Search
Now showing items 31-40 of 73
An Evaluation of Energy-Saving Retrofits from the Texas LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report discusses the LoanSTAR retrofit savings through December 1993 with an emphasis on the Constant Volume to Variable Air Volume air-handler retrofits. The report also summarizes several key findings about the ...
Potential Operation and Maintenance (O&M) Savings in the John Sealy North Building at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
The LoanSTAR Monitoring and Analysis Group, Energy Systems Laboratory at Texas A&M University, was requested by University of Texas Medical Branch at Galveston to investigate O&M measures in their five LoanSTAR program ...
Redesign of Lighting Fixtures for the Texas Department of Corrections
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1988)
Over 100 tests of potential design modifications for the cell light
fixtures used by the Texas Department of Corrections have been
conducted. As a result of these tests, the following recommendations
are made:
1. Turn ...
An Overview of Measured Energy Retrofit Savings Methodologies Developed in the Texas LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
Development of methodologies to determine energy retrofit savings in commercial buildings (institutional buildings, schools, hospitals, offices, county and state buildings,...) has been the object of active research during ...
Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests; Literature Review and Site Selection, Nov. 1997 (Revised Feb. 1998)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1997)
This is the preliminary report contains the literature review and site selection recommendations for ASHRAE Research Project RP 1004 — "Determining Long-term Performance of Cool Storage Systems From Short-term Tests".
Simulation of the Post-Retrofit Thermal Energy Use for the University Teaching Center (UTC) Building with the Use of Simplified System Models
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Several state owned buildings with dual-duct constant volume (DDCV) systems have
been retrofitted with energy efficient variable air volume systems (VAV) as part of the
Texas LoanSTAR Program. One method of determining ...
Bias in Predicting Annual Energy Use in Commercial Buildings with Regression Models Developed from Short Data Sets
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
An empirical or regression modeling approach is simple to develop and easy to use compared to use of detailed hourly simulations. Therefore, regression analysis has become a widely used tool in the determination of annual ...
Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Preliminary Engineering Survey, USDOE Forrestal and Germantown Facility, Summary Report, USDOE Office of Conservation and Energy
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The purpose of this preliminary engineering survey of the USDOE Forrestal and Germantown
facilities is to determine whether existing EMCSs can be used for monitoring energy retrofits, and in
the case where this is not ...
Rebuild America Program – Brazos Valley Energy Conservation Coalition – Quarterly Report for July – September 1998
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
The Brazos Valley Energy Conservation Coalition (BVECC), administered by the Energy Systems Laboratory (ESL) of Texas A&M University, in College Station, Texas received notification of the U.S. Department of Energy ...
Savings Analysis of Utility Bills for Unmonitored Sites, Volume II: Detailed Savings Calculations, Texas LoanSTAR Monitoring and Analysis Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
Detailed calculations for each site are shown in this Volume. For each site the ECRM description, approved loan amount, expected savings, the pre and post-retrofit energy use (electricity and gas separately), cost of energy, ...