Retrospective Testing of an Automated Building Commissioning Analysis Tool (ABCAT)
(Energy Systems Laboratory, 2009-01)
More than $18 billion of energy is wasted annually in the U.S. commercial building sector. Commissioning services have proven successful in reducing building energy consumption, but the optimal energy performance obtained ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002
(2002-12)
This report presents electricity, natural gas and cooling baselines for the thermal plant,
buildings located in the 87000 block, and the III Corp building at Ft. Hood. A baseline
analysis is also presented for the natural ...
Retrofit Savings for Brazos County
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2001)
This report presents the energy and dollar savings for the period May 2000 - April 2001 for 10 of the Brazos County facilities that have been retrofit. The electricity use saved was 555,170 kWh and the demand was 1062 kW, ...
Energy Savings Report For Dallas County, July 2000 – June 2001
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2001)
This report presents the energy and dollar savings for the period July 2000 - June 2001 for 12 Dallas County facilities that have been retrofit by Enershop. The savings for this period total $745,046, which represent 73.2% ...
Data Visualization for Quality-Check Purposes of Monitored Electricity Consumption in All Office Buildings in the ESL Database
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
This report comprises an effort to visualize the monitored electricity consumption in all office buildings (not including the office buildings comprising other functions as classrooms and laboratories, for instance) in the ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was conceived as a $98.6 million capital retrofit program for building energy efficiency. The funding source is petroleum violation escrow funds (PVE) from the ...
Lessons Learned from Continuous Commissioning of the Robert E. Johnson State Office Building, Austin, TX
(2008-09-22)
The Robert E. Johnson State Office building is a 5-story, 303,389 square foot office building built in 2000 located in downtown Austin, TX. The original building design included a number of energy conservation measures ...
Compilation of Diversity Factors and Schedules for Energy and Cooling Load Calculations, ASHRAE Research Project 1093-RP, Final Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2001)
This is the final report for the ASHRAE 1093-RP project. This report presents the method used to derive the diversity factors and typical load shapes of lighting and receptacle loads in office buildings. In this report the ...
Development of a Toolkit for Calculating Linear, Change–Point Linear and Multiple–Linear Inverse Building Energy Analysis Models, ASHRAE Research Project 1050-RP, Detailed Test Results
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2001)
This is the detailed test report for the ASHRAE 1050-RP project. This report presents the detailed results of the testing of IMT (Inverse Modeling Toolkit). Two kinds of testing were performed, bounds testing and accuracy ...
Measuring Energy-Saving Retrofits: Experiences from the LoanSTAR Program
(2005-09-27)
In 1988 the Governor's Energy Management Center of Texas received approval from the U.S. Department of Energy to establish a $98.6 million state-wide retrofit demonstration revolving loan program to fund energy-conserving ...