Search
Now showing items 1-4 of 4
A Study of the Advanced Systems at the CMU Intelligent Workplace with an Evaluation of Potential Applications to Texas A&M International University
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-04)
A detailed study has been conducted of the performance of several innovative aspects of the Intelligent Workplace (IW) at Carnegie Mellon University, a low energy consumption building that uses radiant heating, cooling and ...
Lessons Learned from Continuous Commissioning® of a LEED Gold Building in Texas
(2008-09-22)
The subject building is a relatively new building with 120,000 square feet located in Texas and was the first LEED® Gold building in the area. To earn the title of a green building, the designers of this high performance ...
Lessons Learned from Continuous Commissioning of the Robert E. Johnson State Office Building, Austin, TX
(2008-09-22)
The Robert E. Johnson State Office building is a 5-story, 303,389 square foot office building built in 2000 located in downtown Austin, TX. The original building design included a number of energy conservation measures ...
Commissioning Lessons from Study of the Advanced Systems at the CMU Intelligent Workplace
(2008-04)
A detailed study has been conducted of the performance of several innovative aspects of the Intelligent Workplace (IW) at Carnegie Mellon University, a low energy consumption building that uses radiant heating, cooling and ...