Search
Now showing items 51-60 of 77
Compilation of Diversity Factors and Schedules for Energy and Cooling Load Calculations, Phase II Report - Identified Relevant Data Sets, Methods, and Variability Analysis
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
This is the second report of the ASHRAE 1093-RP project that reports on the progress during the scheduled Phase II effort. In this report, we present: (1) the data sets identified and acquired required for the analysis; ...
Sample M&V Plan from the Texas Workshop: Preparing and Evaluating Measurement and Verification Plans for Energy Performance Contracts in Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
This document contains a sample M&V plan that has been prepared in accordance with the Texas Guidelines for Measurement and Verification for Energy Performance Contracts. This sample M&V plan was extracted from the March ...
Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests; Literature Review, Preliminary Methodology Description, and Final Site Selection (Final Revision of Nov. 1997 Report)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
This preliminary report contains the literature review, a preliminary description of the methodologies that have been chosen for the project and final site selection recommendations for ASHRAE Research Project RP 1004 ~ ...
Energy Analysis, Baselining and Modeling of Prairie View A&M University
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
Analysis of the available data found that electricity savings in the J.B. Coleman Library for June - September, 1998 were 298 MWh, or 38% of the baseline consumption during these months. Extrapolation of these savings to ...
The USDOE Forrestal Building Lighting Retrofit: Preliminary Analysis of Electricity Savings
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
In September of 1993 a 36,832 fixture lighting retrofit was completed at the United States Department of Energy Forrestal complex in Washington, D.C. This retrofit represents DOE's largest project to date that utilizes a ...
Monitoring and Reporting Services for the Toronto Library, Final Report, TESCOR Energy Services, through Energy Systems Associates and New Horizons Technology
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
This report summarizes the work performed for TESCOR Energy Services through Energy Systems Associates and New Horizons Technology. This work includes the monitoring and analysis of data from the data logger that was ...
Potential Energy Savings from Optimized Schedule and Economizer Cycles in the Moody Library at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report presents the results of a study which was initiated in order to estimate the potential energy savings due to optimizing the HVAC operation schedule and using economizer cycles in the Moody Library Building ...
Prairie View A&M University Whole Campus Energy Analysis
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Prairie View A&M University started a large scale energy management program in 1987 and 1988. This
report presents an analysis of whole-campus energy consumption at the Prairie View A&M Campus where
whole-campus indices ...
Economic Calculations for the ASHRAE Handbook
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
Estimated Savings from Turning Off Unnecessary Electrical Loads During Unoccupied Periods at the Langford Architecture Center
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report presents the results of an on-off test conducted to determine the lighting load in the studios on the third and fourth floors of the Langford Architecture Center Building A and the savings that would be achieved ...