A Sustainable Medical Center in Texas
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The purpose of this presentation is to
demonstrate how one can successfully integrate
many sustainable features into the construction and
operation of a mid-sized medical clinic located in the
hot/humid piney woods of east ...
A Systems Integration Approach To Lighting Control Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
Today, the lighting industry is experiencing renewed
development and implementation of advanced
technologies. One of the most striking advances is the
implementation of system solutions in lighting
control. This approach ...
Control Humidity With Single-Duct, Single-Zone, Constant Air Volume System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The lecture hall of the Richardson Petroleum
Building at Texas A&M University is a large lecture
hall, with a total floor area of approximately 2500 ft^2.
The lecture hall was served by a constant air volume
(CAV) air ...
The Impact of Above-Sheathing Ventilation on the Thermal and Moisture Performance of Steep-Slope Residential Roofs and Attics
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
A Pilot Case Study of Measurement and Verification for a Major Texas State Agency Performance Contracting Initiative
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2006)
Metering and the New Federal Requirements of Energy Policy Act 2005
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The Kleberg Building on the Texas A&M
University campus is a teaching/research facility
consisting of classrooms, offices and laboratories,
with a total floor area of approximately 165,030 ft2.
Continuous Commissioning ...
The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
Monitoring Electricity Consumption in the Tertiary Sector- A Project within the Intelligent Energy Europe Program
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
The electricity consumption in the tertiary sector in the EU is still increasing and a further increase is expected of more than 2 % per year during the next 15 years. This sector includes companies and institutions of ...
Simulated Energy Savings Comparison Between Two Continuous Commissioning® Methods Applied to a Retrofitted Office Building
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® (CC®) was performed on a 24,446 square foot institutional building used primarily to house offices and conference rooms. The building was constructed in 1950, and then had a complete Heating, ...