Browsing ICEBO - International Conference for Enhanced Building Operations by Title
Now showing items 136-155 of 1002
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2013)This paper presents an update of the integrated NOx emissions reductions calculations developed by the Energy Systems Laboratory (ESL) for the State of Texas to satisfy the reporting requirements for Senate Bill 5 of the ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)Four areas in Texas have been designated by the United States Environmental Protection Agency (EPA) as non-attainment areas because ozone levels exceed the National Ambient Air Quality Standard (NAAQS) maximum allowable ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)Four areas in Texas have been designated by the United States Environmental Protection Agency (EPA) as non-attainment areas because ozone pollution levels exceed the National Ambient Air Quality Standard (NAAQS) maximum ...
-
Calibration of an EnergyPlus Building Energy Model to Assess the Impact of Demand Response Measures (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2013)
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2013)The calibrated building energy models can be used for the verification and improvement of building operation. This paper proposes a bottom-up approach for the assisted calibration of a building energy model developed with ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2007)
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2011)The use of whole building utility interval data for verifying energy savings from energy efficiency projects has become an attractive option as this data is increasingly available. Formal protocols, such as IPMVP Option C ...
-
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)Whole building interval analysis to determine savings from energy reduction measures is addressed in several guidelines. The whole building method has typically focused on measured savings where baseline regression models ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2001)This paper discusses problems found during third party commissioning of projects where humidity control was an indicator of significant problems. Project 1 was an 8000 square foot library. Problems found included air ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)Energy Information Systems (EIS), which can monitor and analyze building energy consumption and related data throughout the Internet, have been increasing in use over the last decade. Though EIS developers describe the ...
-
Case Study and Energy Performance Optimization for Dell Children's Medical Center of Central Texas (Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)Dell Children’s Medical Center of Central Texas (DCMCCT) is the first hospital in the world to achieve LEED Platinum certification. A major contributor to this certification is an on-site 4.3 Megawatt combined heating, ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2014)
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2014)
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)The case study building is a two-story office facility with total floor area of 31000 square feet, of which most is open space office. The HVAC system operates 24 hours a day, 7 days a week. An energy audit was conducted ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)This paper introduces a continuous commissioning of the VAV system in a real building in China. On the base of nearly one year's testing data, the energy conservation level of the project is analyzed, and significance of ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)Building progress consists of master planning, design detail, construction, acceptance and management phases. Due to lack of communication, there are many gaps between the adjacent phases in building progress, such as, the ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)This paper describes retro commissioning of a standard commercial office building in Japan. The owner's expectations for retro commissioning are realization of energy and cost savings, and controlling the increase in ...
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2007)
-
Case Study on Enhancing Equipment Efficiency and Operational Practices of a Signature LEED Building (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
-
(Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)