Search
Now showing items 1-10 of 11
Implementation of Industrial Assessment Center Energy and Waste Management Recommendations
(Energy Systems Laboratory (http://esl.tamu.edu), 1997-04)
The Industrial Assessment Center at Texas A&M University is funded by the U.S. Department of Energy and involves students in the analysis of nearby Texas manufacturers. Through these analyses, the Industrial Assessment ...
LoanSTAR Energy Auditing: Update and Changes
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1992-05)
Annual savings identified by detailed LoanSTAR audits during the period January, 1989 -December, 1991 are $13.7 million with an investment cost of $46.1 million. These savings represent retrofit projects in state-owned ...
An Analysis of Two Industrial Assessment Center Extended Assessments
(Energy Systems Laboratory (http://esl.tamu.edu), 1999-05)
The Industrial Assessment Center at Texas A&M University extended assessments by spending about two extra days at each of three manufacturing plants. The extended assessments are characterized by use of sophisticated ...
Electrical and Production Load Factors
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-05)
Load factors and operating hours of small and
medium-sized industrial plants are analyzed to
classify shift-work patterns and develop energy
conservation diagnostic tools. This paper discusses
two types of electric ...
A Comparison of Demand Side Management Data Assessment Procedures for Small and Medium-Sized Manufacturing Plants
(Energy Systems Laboratory (http://esl.tamu.edu), 1995-04)
Two methods of obtaining demand reduction data from industrial energy audits are compared. One very simple method calculates demand savings by dividing energy savings in kilowatt hours by the operating hours of the plant. ...
Industrial Equipment Demand and Duty Factors
(Energy Systems Laboratory (http://esl.tamu.edu), 1998-04)
Demand and duty factors have been measured for selected equipment (air compressors, electric furnaces, injection molding machines, centrifugal loads, and others) in industrial plants. Demand factors for heavily loaded air ...
First Year Analysis of Industrial Energy Conservation in Texas A&M's Energy Analysis and Diagnostic Center Program
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1988-09)
Texas A&M University's Energy Analysis and
Diagnostic Center (EADC) performed 15 energy
audits of small- to medium-size manufacturing
plants during its first year. The EADC program
is funded by the United States ...
Further Findings Concerning Electrical Energy Monitoring in an Industrial Plant
(Energy Systems Laboratory (http://esl.tamu.edu), 1995-04)
The Energy Systems Laboratory (ESL) at Texas A&M University has monitored the real-time electrical energy consumption, demand, and power factor of a large metal fabrication plant in Houston, Texas for twelve months. Monthly ...
Waste Management Trends in Texas Industrial Plants
(Energy Systems Laboratory (http://esl.tamu.edu), 1995-04)
The Industrial Assessment Center at Texas A&M University has performed several waste and energy minimization surveys in small- and medium- sized industrial manufacturing plants in Texas. During these surveys, Industrial ...
Waste Management Recommendations in the Texas A&M University Industrial Assessment Center Program
(Energy Systems Laboratory (http://esl.tamu.edu), 1996-04)
The Texas A&M University Industrial Assessment Center (IAC) was one of the four Energy Analysis & Diagnostic Centers (EADC) that began providing waste management, in addition to energy and demand conservation, assessments ...