Search
Now showing items 31-40 of 106
Discussion Group T5 On Verification of Protective Systems
(Texas A&M University. Turbomachinery Laboratories, 2011)
Successful Selection And Operation Of Gas Turbine Inlet Filtration Systems
(Texas A&M University. Turbomachinery Laboratories, 2011)
A gas turbine inlet filtration system is important for successful operation. The filtration system minimizes the occurrence of foreign object damage, erosion, fouling, and corrosion. The selection of the inlet filtration ...
Speed Signal Deterioration At High Speeds In Electronic Governor And Trip Systems
(Texas A&M University. Turbomachinery Laboratories, 2011)
Thermoplastic Labyrinth Seals In Centrifugal Compressors -15 Years Of Experiences
(Texas A&M University. Turbomachinery Laboratories, 2011)
Discussion Group T2 (Jointly with P6) On Monitoring Vibration and Other Critical Machine Conditions
(Texas A&M University. Turbomachinery Laboratories, 2011)
Discussion Group P4 (Jointly with T8) On Couplings and Alignment
(Texas A&M University. Turbomachinery Laboratories, 2011)
Discussion Group T12 On Steam Turbine Design, Operation, and Maintenance
(Texas A&M University. Turbomachinery Laboratories, 2011)
Discussion Group P10 On Improving Mean Time Between Pump Failures
(Texas A&M University. Turbomachinery Laboratories, 2011)
Functional Verification through Operation Diagnostics
(Energy Systems Laboratory, 2011-10)
One of the core objectives of the commissioning process is to ensure that the dynamic systems
function correctly. Just as important, if not more so, is enabling the correct function of those
systems throughout occupancy. ...
RCFA For Recurring Impeller Failures In A 4.7 Mtpa LNG Train Propane Compressor
(Texas A&M University. Turbomachinery Laboratories, 2011)
A Root Cause Failure Analysis (RCFA) for repeated impeller blade failures in a five stage centrifugal propane compressor is described. The initial failure occurred in June 2007 with a large crack found in one blade on the ...