Search
Now showing items 1-4 of 4
R7 - Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure. Annual Report - Year 1
(Stochastic Geomechanics Laboratory, 2021-07-15)
Annual report of R7 project: R7 - Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure. The report lists and details on the activities conducted from June 2020 to June 2021. The milestones ...
R7 - Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure. Semi-annual Report - Year 1
(Stochastic Geomechanics Laboratory, 2020-11-24)
Semi annual report of R7 project: R7 - Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure. The report lists and details on the activities conducted from June 2020 to November 2020.
R7 - Internal Report on Bayesian Risk Assessment & Management Model Development V0.0
(Stochastic Geomechanics Laboratory, 21-Feb)
Internal report on the development steps for a Risk Assessment and Management model using Bayesian Networks. The objectives of the model include: mapping qualitatively participating processes needed to simulate prognosis ...
R7 - Internal Report on Bayesian Risk Assessment & Management Model Development V1.0
(Stochastic Geomechanics Laboratory, 2021-05-24)
The version 0.0 of the Bayesian Networks (BN) model was updated to include variables and processes identified during the development of R7 project, guided by the variables present in Social Vulnerability Indexes from both ...