dc.creatorWei, G.
dc.creatorVeteto, B.
dc.creatorLiu, M.
dc.date.accessioned2005-07-25T21:05:16Z
dc.date.available2005-07-25T21:05:16Z
dc.date.issued1996
dc.identifier.otherTR-96-09-01
dc.identifier.urihttps://hdl.handle.net/1969.1/2162
dc.description.abstractAs part of the engineering assistance project, the ESL staff worked with operating staff at the power plant: (1) to evaluate the boiler efficiency of boiler 9 by using combustion analysis; (2) to evaluate gas and steam meters by using measured air flow rate; (3) to identify air leakage through the pre-heater by balancing 0, before and after the pre-heater; and (4) to correct air and steam metered data.en
dc.format.extent746331 bytesen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherEnergy Systems Laboratory (http://esl.tamu.edu), Texas A&M University
dc.publisherDepartment of Mechanical Engineering, Texas A&M University
dc.rightsAll rights reserved by the Energy Systems Laboratory of Texas A&M and the authors.en
dc.subjectboiler efficiencyen
dc.subjectmeasured air flow rateen
dc.subjectmetered dataen
dc.subjectOperational Performance Evaluationen
dc.titleOperational Performance Evaluation of Boiler 9 at the TAMU Power Plant at College Station, Submitted to the Power Plant of Texas A&M Universityen
dc.typeTexten