Visit the Energy Systems Laboratory Homepage.
dc.creator | Wei, G. | |
dc.creator | Veteto, B. | |
dc.creator | Liu, M. | |
dc.date.accessioned | 2005-07-25T21:05:16Z | |
dc.date.available | 2005-07-25T21:05:16Z | |
dc.date.issued | 1996 | |
dc.identifier.other | TR-96-09-01 | |
dc.identifier.uri | https://hdl.handle.net/1969.1/2162 | |
dc.description.abstract | As part of the engineering assistance project, the ESL staff worked with operating staff at the power plant: (1) to evaluate the boiler efficiency of boiler 9 by using combustion analysis; (2) to evaluate gas and steam meters by using measured air flow rate; (3) to identify air leakage through the pre-heater by balancing 0, before and after the pre-heater; and (4) to correct air and steam metered data. | en |
dc.format.extent | 746331 bytes | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | en_US | |
dc.publisher | Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University | |
dc.publisher | Department of Mechanical Engineering, Texas A&M University | |
dc.rights | All rights reserved by the Energy Systems Laboratory of Texas A&M and the authors. | en |
dc.subject | boiler efficiency | en |
dc.subject | measured air flow rate | en |
dc.subject | metered data | en |
dc.subject | Operational Performance Evaluation | en |
dc.title | Operational Performance Evaluation of Boiler 9 at the TAMU Power Plant at College Station, Submitted to the Power Plant of Texas A&M University | en |
dc.type | Text | en |
This item appears in the following Collection(s)
-
Technical Reports
Technical Reports from the Energy Systems Laboratory