dc.descriptionLectures
dc.description.abstractFour sets of hydraulic turbocharger based energy recovery systems (2000 hp each) were successfully designed, manufactured, tested and commissioned for Acid Gas Recovery plants (AGR) in Saudi Arabia. These five units can result in reduction in CO2 footprint by 40,400 tons per year in addition to providing stability of operations, increasing reliability, reducing energy consumption by a total of 57.5 GW-hr each year and a major reduction in noise level otherwise generated by the let-down valve. A somewhat smaller unit (1000 hp) has also been designed tested and commissioned on a fifth AGR unit on a different gas field. The hydraulic turbocharger consists of a liquid phase turbine runner and a pump impeller mounted in a back�to�back configuration on a common rigid shaft, in a single seal�less casing. The shaft is supported by process lubricated hydrodynamic radial and axial (dual�acting) bearings of non�metallic construction. The turbine side extracts wasted pressure energy from the rich amine and along with a series of throttle, auxiliary and bypass valves, controls the level in the absorber. The pump side boosts the lean amine solvent to the absorber. Such a design provides major advantages compared to a conventional configuration of a reverse running pump�as�turbine coupled to a pump. These advantages include a compact single stage hydraulic design (as opposed to a multi�stage design for a reverse running pump), smaller footprint, higher efficiency, absence of mechanical seals & associated support system, absence of lubrication oil system as well as simpler control. Several complex design and testing challenges were overcome through development of novel design features and incorporation of provisions in a highly specialized test loop. Some of the unique experiences are shared in the paper. The seal�less design of the turbocharger with no exposed rotating or bearing parts presented testing challenges such as determination of shaft power, individual pump side and turbine side performance and efficiencies; measurement and validation of axial thrust & axial position; as well as monitoring & control of bearing performance parameters. The test loop was engineered to operate the hydraulic turbocharger through its testable operating range with provisions to measure, control and monitor all the needed parameters. Testing was performed using water with viscosity 2.5 times lower than the operating fluid. This implied suitable modification to the design, monitoring and controlling of process�lubricated bearings along with the internal system during testing to account for the change in viscosity. Data was evaluated to conduct root cause analysis of apparent bearing failures such as rub marks and to eliminate root causes by improving the manufacturing method to reduce misalignment & also using non�metallic bearings. Four identical units were built and completed successful Factory Acceptance Tests (FAT) in early 2018. The turbochargers achieved & surpassed the pump side rated requirements of 2148ft of head at 2820 gpm, at a rated speed of 8000 rpm, as part of the FAT. The fifth smaller unit is also installed and commissioned. All the units were installed & commissioned in early 2020 by the End User. Each unit is part of 4x50 configuration – which includes the turbocharger and three circulation pumps running in parallel. The paper will provide details about the commissioning effort of the turbocharger units in the field, and their operating experience over a period of one year.
dc.format.mediumElectronic
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.publisherTurbomachinery Laboratory, Texas A&M Engineering Experiment Station
dc.relation.ispartofAsia Turbomachinery & Pump Symposium. 2022 Proceedings.
dc.titleCARBON FOOTPRINT REDUCTION IN ACID GAS RECOVERY SYSTEM THROUGH DESIGN, DEVELOPMENT AND DEPLOYMENT OF A 2000HP HYDRAULIC TURBOCHARGER
dc.type.genreconference publication
dc.type.materialText
dc.format.digitalOriginborn digital


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record