Browsing Cross-Border Threat Screening and Supply Chain Defense: DHS Center of Excellence (CBTS) by Subject "Risk management--Mathematical models"
Now showing items 1-10 of 10
-
(Stochastic Geomechanics Laboratory, 2021-05-20)During this presentation, members of the Stochastic Geomechanics Laboratory at Texas A&M University presented their work of two different research projects. The projects, hosted at the Center Of Excellence CBTS are related ...
-
(Stochastic Geomechanics Laboratory, 2021-05-21)COVID-19 has generated disruptions on supply chains across the world with impacts reflected in shortage, or delay of supplies, accompanied by strong shifts of demand for several economic sectors. Under such a disruption, ...
-
(Stochastic Geomechanics Laboratory, 2021-05-21)COVID-19 has generated disruptions on supply chains across the world with impacts reflected in shortage, or delay of supplies, accompanied by strong shifts of demand for several economic sectors. Under such a disruption, ...
-
(Stochastic Geomechanics Laboratory, 2021-04-29)Video created for the R7 project: Project: Model Development for Risks posed by COVID-19 on U.S. Trade supply chains Infrastructure. The video presents the main objectives of the project, as well, as the Risk Assessment ...
-
(Stochastic Geomechanics Laboratory, 21-Feb)Internal report on the development steps for a Risk Assessment and Management model using Bayesian Networks. The objectives of the model include: mapping qualitatively participating processes needed to simulate prognosis ...
-
(Stochastic Geomechanics Laboratory, 2021-05-24)The version 0.0 of the Bayesian Networks (BN) model was updated to include variables and processes identified during the development of R7 project, guided by the variables present in Social Vulnerability Indexes from both ...
-
(Stochastic Geomechanics Laboratory, 2021-07-15)Annual report of R7 project: R7 - Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure. The report lists and details on the activities conducted from June 2020 to June 2021. The milestones ...
-
(Stochastic Geomechanics Laboratory, 2020-11-24)Semi annual report of R7 project: R7 - Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure. The report lists and details on the activities conducted from June 2020 to November 2020.
-
(Stochastic Geomechanics Laboratory, 2021-09-21)The U.S. - Mexico border has a great significance for the movement of people, but also for the commercial trade. Different industries and supply chains, instrumental for the economic activity of both countries, are involved. ...
-
(Stochastic Geomechanics Laboratory, 2021-09-01)Home page screen capture of the website dedicated to the R7 project: Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure. The milestones of the project are: 1. To generate a risk-guided ...