Search
Now showing items 21-30 of 32
Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at West Texas A&M University (WTAMU) Canyon, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The physical plant director and staff at West Texas A&M University (WTAMU) do a very good job of maintaining WTAMU facilities and keeping expenses down. During our visit, however, we were able to identify several opportunities ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was conceived as a $98.6 million capital retrofit program for building energy efficiency. The funding source is petroleum violation escrow funds (PVE) from the ...
Prairie View A&M University Whole Campus Energy Analysis
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Prairie View A&M University started a large scale energy management program in 1987 and 1988. This
report presents an analysis of whole-campus energy consumption at the Prairie View A&M Campus where
whole-campus indices ...
Texas LoanSTAR Monitoring and Analysis Program—Monitoring and Advisory and Review Committee (January 1991)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Texas LoanSTAR Monitoring and Analysis Program Draft Plan
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1989)
Major objectives of the LoanSTAR Monitoring and Analysis Program
(MAP) are to:
verify energy and dollar savings of energy conservation
retrofits in state, school and local government
buildings;
reduce energy costs by ...
Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume I)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report is Volume I of a two volume set that documents the progress since the January 1991 MARC meeting. This first voume contains photocopies of the ...
Prairie View A&M University Whole Campus Energy Report Update
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1992)
Prairie View A&M University started a large scale energy management program in 1987 and 1988. This
updated report presents an analysis of whole-campus energy consumption at the Prairie View A&M Campus
where whole-campus ...
Improving Building Energy System Performance by Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly ...
Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at Prairie View A&M University (PVAMU) Prairie View, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The physical plant director and staff at Prairie View A&M University (PVAMU) do a good job of maintaining PVAMU facilities and keeping expenses down. During our visit, however, we were able to identify several opportunities ...