Search
Now showing items 11-20 of 20
Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Final Summary Report for USDOE Office of Conservation and Energy, Final Revision, March 1993
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Traditionally, Energy Management and Control Systems (EMCSs) have been used to control
HVAC, lighting, fire and security systems in buildings. Few EMCSs are used for long term
trending and analysis of energy use (i.e., ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was conceived as a $98.6 million capital retrofit program for building energy efficiency. The funding source is petroleum violation escrow funds (PVE) from the ...
Potential Energy Savings from Optimized Schedule and Economizer Cycles in the Moody Library at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report presents the results of a study which was initiated in order to estimate the potential energy savings due to optimizing the HVAC operation schedule and using economizer cycles in the Moody Library Building ...
Texas LoanSTAR Monitoring and Analysis Program—Monitoring and Advisory and Review Committee (January 1991)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Texas LoanSTAR Monitoring and Analysis Program Draft Plan
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1989)
Major objectives of the LoanSTAR Monitoring and Analysis Program
(MAP) are to:
verify energy and dollar savings of energy conservation
retrofits in state, school and local government
buildings;
reduce energy costs by ...
Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume I)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report is Volume I of a two volume set that documents the progress since the January 1991 MARC meeting. This first voume contains photocopies of the ...
Potential Operation and Maintenance (O&M) Savings in the John Sealy South Building at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
The LoanSTAR Monitoring and Analysis Group was requested by UTMB to investigate O&M measures in their five LoanSTAR program buildings. This report describes the suggested O&M measures in John Sealy South Building, an ...
Improving Building Energy System Performance by Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly ...
Measuring Energy-Saving Retrofits: Experiences from the LoanSTAR Program
(2005-09-27)
In 1988 the Governor's Energy Management Center of Texas received approval from the U.S. Department of Energy to establish a $98.6 million state-wide retrofit demonstration revolving loan program to fund energy-conserving ...
The Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume II)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report
is Volume II of a two volume set that documents the progress since the January 1991
MARC meeting.
This second volume contains papers and ...