Search
Now showing items 11-20 of 62
Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I--Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2008-December 2008
(2009-12)
The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, ...
Validation of the International Code Compliant Calculator (IC3) Using the RESNET Verification Procedures (No. 07-003)
(2009-12)
This report presents results from the testing and validation of the Energy System's Laboratory's web-based software tool--International Code Compliance Calculator (IC3), v3.3, using the Residential Energy Services Network ...
TCEQ Annual Preliminary Report: Integrated NOx Emissions Savings from EE/RE Programs Statewide
(Energy Systems Laboratory, 2016-10)
Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Preliminary Report: Integrated NOX Emissions Savings from EE/RE Programs Statewide
(Energy Systems Laboratory, Texas A&M Energy Experimentation Station, 2020-11)
Application Evaluation of the Market Square Project, Cleveland, Ohio
(Energy Systems Laboratory, 2019-08)