Show simple item record

dc.contributor.otherTurbomachinery Symposium (20th : 1991)
dc.creatorAkhtar, Kazim
dc.creatorForsthoffer, W. E.
dc.date.accessioned2017-10-05T14:14:10Z
dc.date.available2017-10-05T14:14:10Z
dc.date.issued1991
dc.identifier.urihttps://hdl.handle.net/1969.1/163551
dc.descriptionLectureen
dc.descriptionPg. 113-122en
dc.description.abstractEvery user would like to check the mechanical integrity of rotating equipment in the field before startup. In the case of large compressor trains with steam turbine drives, running a mechanical string test with associated piping and auxiliaries provides positive check outs for compressor, driver, and all auxiliary equipment. The benefits of planning, preparation, and execution of such a program are described.en
dc.format.mediumElectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.publisherTexas A&M University. Turbomachinery Laboratories
dc.relation.ispartofProceedings of the 20th Turbomachinery Symposiumen
dc.subject.lcshTurbomachinesen
dc.titleDo It Right The First Time - A Review Of An Ethylene Plant Turbomachinery Commissioning Test.en
dc.type.genrePresentationen
dc.type.materialTexten
dc.identifier.doihttps://doi.org/10.21423/R1RH3D


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record