dc.contributor.other | Turbomachinery Symposium (20th : 1991) | |
dc.creator | Akhtar, Kazim | |
dc.creator | Forsthoffer, W. E. | |
dc.date.accessioned | 2017-10-05T14:14:10Z | |
dc.date.available | 2017-10-05T14:14:10Z | |
dc.date.issued | 1991 | |
dc.identifier.uri | https://hdl.handle.net/1969.1/163551 | |
dc.description | Lecture | en |
dc.description | Pg. 113-122 | en |
dc.description.abstract | Every user would like to check the mechanical integrity of rotating equipment in the field before startup. In the case of large compressor trains with steam turbine drives, running a mechanical string test with associated piping and auxiliaries provides positive check outs for compressor, driver, and all auxiliary equipment. The benefits of planning, preparation, and execution of such a program are described. | en |
dc.format.medium | Electronic | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | en | |
dc.publisher | Texas A&M University. Turbomachinery Laboratories | |
dc.relation.ispartof | Proceedings of the 20th Turbomachinery Symposium | en |
dc.subject.lcsh | Turbomachines | en |
dc.title | Do It Right The First Time - A Review Of An Ethylene Plant Turbomachinery Commissioning Test. | en |
dc.type.genre | Presentation | en |
dc.type.material | Text | en |
dc.identifier.doi | https://doi.org/10.21423/R1RH3D | |