Do It Right The First Time - A Review Of An Ethylene Plant Turbomachinery Commissioning Test.
Abstract
Every user would like to check the mechanical integrity of rotating equipment in the field before startup. In the case of large compressor trains with steam turbine drives, running a mechanical string test with associated piping and auxiliaries provides positive check outs for compressor, driver, and all auxiliary equipment. The benefits of planning, preparation, and execution of such a program are described.
Description
LecturePg. 113-122
Subject
TurbomachinesCollections
Citation
Akhtar, Kazim; Forsthoffer, W. E. (1991). Do It Right The First Time - A Review Of An Ethylene Plant Turbomachinery Commissioning Test.. Texas A&M University. Turbomachinery Laboratories. Available electronically from https : / /hdl .handle .net /1969 .1 /163551.