Program Overview: The Texas LoanSTAR Program; 1989-August 1997
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
The Texas LoanSTAR mans to Save Taxes
and Resources) program was conceived as a $98.6
million capital retrofit program for building energy
efficiency. The funding source is petroleum violation
escrow funds (PVE) from the ...
Implementation of Industrial Assessment Center Energy and Waste Management Recommendations
(Energy Systems Laboratory (http://esl.tamu.edu), 1997-04)
The Industrial Assessment Center at Texas A&M University is funded by the U.S. Department of Energy and involves students in the analysis of nearby Texas manufacturers. Through these analyses, the Industrial Assessment ...
LoanSTAR Energy Auditing: Update and Changes
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1992-05)
Annual savings identified by detailed LoanSTAR audits during the period January, 1989 -December, 1991 are $13.7 million with an investment cost of $46.1 million. These savings represent retrofit projects in state-owned ...
Texas LoanSTAR Monitoring and Analysis Program Progress Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1990)
Eleven audit reports have been accepted by the review staff at Texas A&M
University. These eleven reports cover 3.8 million square feet of building space and two
street-lighting projects. One engineer has been employed ...
An Analysis of Two Industrial Assessment Center Extended Assessments
(Energy Systems Laboratory (http://esl.tamu.edu), 1999-05)
The Industrial Assessment Center at Texas A&M University extended assessments by spending about two extra days at each of three manufacturing plants. The extended assessments are characterized by use of sophisticated ...
LoanSTAR Energy Conservation Audits: January 1989 - August 1990
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1990)
Fourteen audit reports, covering seventy buildings
and Texas' Governor's mansion, have been accepted as a
part of the Texas LoanSTAR Program. Task 1 (the first of
five) is responsible for audit reviews and assignments. ...
Texas LoanSTAR Monitoring and Analysis Program—Monitoring and Advisory and Review Committee (January 1991)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
A Comparison of Demand Side Management Data Assessment Procedures for Small and Medium-Sized Manufacturing Plants
(Energy Systems Laboratory (http://esl.tamu.edu), 1995-04)
Two methods of obtaining demand reduction data from industrial energy audits are compared. One very simple method calculates demand savings by dividing energy savings in kilowatt hours by the operating hours of the plant. ...
Industrial Equipment Demand and Duty Factors
(Energy Systems Laboratory (http://esl.tamu.edu), 1998-04)
Demand and duty factors have been measured for selected equipment (air compressors, electric furnaces, injection molding machines, centrifugal loads, and others) in industrial plants. Demand factors for heavily loaded air ...
Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume I)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report is Volume I of a two volume set that documents the progress since the January 1991 MARC meeting. This first voume contains photocopies of the ...