Search
Now showing items 451-460 of 8510
Ontario's Industrial Energy Services Program
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1987-09)
The Ontario Ministry of Energy began offering
its new Industrial Energy Services Program (IESP)
in early 1987. This 3-year, $5-million program,
while not new in concept, is thought to be unique
for its depth of service ...
Cogeneration Markets: An Industry in Transition
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1987-09)
The year 1986 saw three fundamental changes in the character of development of cogeneration on the U.S. Gulf Coast. First, numerous large projects were cancelled, delayed, or drastically down-sized during 1986. Most capacity ...
Fault Detection and Diagnosis Method for VAV Terminal Units
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
This paper proposes two fault detection and diagnosis methods for VAV units without a sensor of
supply air volume, and the results of applying these methods to a real building are presented. One method
detects faults by ...
Automatic Commissioning of Multiple VAV Terminals
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
A site survey on a modern operating commercial building screened 261 ineffective VAV (Variable
Air Volume) boxes (20.9% of the total boxes in the building) and summarized ten typical faults for VAV
air-conditioning system(s) ...
Continuous Commissioning of Salt Lake Community College South City Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The State of Utah's Department of Natural Resources funded two projects in Salt Lake City to
demonstrate the feasibility of the Continuous Commissioning® (CC®)1 process. The two sites selected were a modern state
building, ...
Implementation of Partial Initial Commissioning During the Elaboration and Construction Phase
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
This paper describes how manual methods for partial initial commissioning can be implemented
during the elaboration and construction phase. The main purpose is to reduce the risk of exceeding
the time schedule and the ...
Commissioning of Building HVAC Systems for Improved Energy Performance: A Summary of Annex 40 Results
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
Annex 40 is an international research project which aims at developing,
validating and documenting tools for commissioning of buildings and
building services. A few months before the end of this 4 years project one
presents ...
Embedded Commissioning for Building Design
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
Building Commissioning has a broad scope that extends to all phases of building delivery. We view commissioning
as a building delivery embedded process that persistently verifies and validates design intent throughout the ...
Vision of a Multi Properties Owner
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
A Demand-Side Management Experience in Existing Building Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
As part of a suite of demand-side management (DSM) program offerings, Xcel Energy provides a
recommissioning program to its Colorado commercial customers. The program has a summer peak-demand savings
goal of 7.8 MW to be ...