Search
Now showing items 401-410 of 8510
TQM, ISO 9000, and Commissioning (Let's Be Practical)
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Diversity between building projects and construction methods is such that it is not possible to
evoke a single phrase, commissioning, directly or conceptually and assume all building
performance problems are solved. ...
Achieving Better Building Performance and Savings Using Optimal Control Strategies
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Continuous Commissioning (CCSM) process has
become a very important energy conservation topic
for new and existing commercial buildings. This
process can yield substantial operating savings,
improved indoor air quality, ...
Measurement and Numerical Simulation of Wind Environment for One Residential District
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
A residential quarter in the west of Changsha has a nearby main transport corridor to the east,and Tianma Hill is to the west. The circumference of this residential quarter is open to the outside; therefore, the wind ...
Model-Based Commissioning Methodology for Simple Duct System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
This paper presents how a simulation model is applied on air leakage and pressure distribution in a duct system and
how it is utilized for duct system commissioning on the three categories below. It focuses on a duct system, ...
Energy Efficiency in Buildings in Switzerland
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
In Switzerland, a culture for low energy concepts is established. The procedure
for quality assurance during design, elaboration, construction, and acceptance
phases is based on detailed technical checklists. These procedures ...
Cooling Performance Assessment of Building America Homes
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...
How the Number and Placement of Sensors Controlling Room Air Distribution Systems Affect Energy Use and Comfort
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
This study assesses the impact of sensor
number and placement on the energy needed to
condition a typical office using several likely variants
of an underfloor air distribution system (UFAD).
The study uses an empirical-based ...
Four Years of On-Going Commissioning in CTEC-Varennes Building with a BEMS Assisted CX Tool
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The development of Building Energy Management Systems (BEMS) offers new opportunities to automate some
aspects of commissioning. Reduction of process cost and manual effort on site, transformation of a one time
application ...
Energy Management Program at Atlanta Postal Service Distribution Center
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
The US Postal Service operates more than 38,000 post offices across the country and spends $350 million
annually on utilities (1). Driven by President Clinton's 1999 Executive Order that mandates a 35 percent
reduction in ...