Search
Now showing items 31-33 of 33
Improving Building Energy System Performance by Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly ...
A Study of Diagnostic Pre-Screening Methods for Analyzing Energy Use of K-12 Public Schools
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report has been prepared for the Office of Buildings and Community Systems at the United States Department of Energy through the Existing Building Efficiency Research Program at Oak Ridge National Laboratory. The ...
The Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume II)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report
is Volume II of a two volume set that documents the progress since the January 1991
MARC meeting.
This second volume contains papers and ...