Search
Now showing items 171-180 of 1233
Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at Texas A&M International University (TAMIU) Laredo, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The physical plant director and staff at Texas A&M International University at Laredo do a very good job of maintaining TAMIU facilities. During our visit, however, we were able to identify several opportunities for improving ...
Potential Operation and Maintenance (O&M) Savings at the Dunbar Middle and Sims Elementary Schools
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report presents the results of a study of the potential cost savings which may be
achieved by improving operational and maintenance (O&M) practices at Dunbar Middle
School and Sims Elementary School in the Fort Worth ...
A Comprehensive Review of the Tests Completed on the Flow Loop at the Energy Systems Laboratory (Draft)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1992)
In 1988 the Governor's Energy Office (GEO) of Texas received approval from the U.S.
Department of Energy to establish a $98.6 million state-wide retrofit demonstration
program, the LoanSTAR (Loan to Save Taxes and ...
Calculating Energy and Demand Retrofit Savings for Stroman High School: Interim Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1992)
As part of the LoanSTAR program, Stroman High School in Victoria Texas underwent
two retrofits: a) an absorption chiller was changed to an electric vapor compression
chiller, and b) an EMCS system was installed after ...
Calculating Energy and Demand Retrofit Savings for Victoria High School: Interim Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1992)
As part of the LoanSTAR program, Victoria High School in Victoria, Texas underwent
two retrofits: a) an absorption chiller was changed to an electric vapor compression
chiller, and b) an EMCS system was installed after ...
Potential Operation and Maintenance (O&M) Savings at the State Capitol Complex
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report presents the results of a study of the potential cost savings by improving
operations and maintenance (O&M) practices at eight buildings of the State Capitol
Complex, monitored by the LoanSTAR program. This ...
Guidelines for Measuring Air Infiltration Heat Exchange Effectiveness (IHEE), Submitted to the Texas Higher Education Coordination Board Energy Research Application Program Project #227
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report is presented to the Texas Higher Education Coordination Board as a
deliverable under the Energy Research and Applications Program Project #227, which
targeted reducing the design size of HVAC systems in houses ...
Potential Operation and Maintenance (O&M) Savings at Schools in the Ft. Worth Independent School District
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
As part of the Texas LoanSTAR program, 44 schools in the Fort Worth Independent
School District (FWISD) had lighting retrofits performed on there in late 1991. The
Energy Systems Laboratory of Texas A&M University is ...
Thermal Comfort Study in a Naturally Ventilated Residential Building in a Tropical Hot-Humid Climate Region
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
This paper presents a thermal comfort study in a
naturally ventilated residential building located in a
tropical hot-humid climate region. The specific
objective of this study is to investigate whether
thermal comfort in ...
Owner's Guide to Understanding Methods and Terms of Performance Contracting
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
Performance Contracting is a method of making
improvements to a facility and using the savings
produced by the improvements to pay for the work
over a period of time, typically five to ten years.
Energy Conservation Measures ...