Search
Now showing items 91-100 of 132
Slurry Pipeline Design For Operation With Centrifugal Pumps
(Texas A&M University. Turbomachinery Laboratories, 1996)
The following covers what the writer sees as the main considerations involved in the design of a slurry pipeline. It is broken down into sections. This section is concerned mainly with the slurry and design of the hydraulics ...
Selection, Design, And Field Testing Of A 10,500 HP Variable Speed Induction Motor Compressor Drive.
(Texas A&M University. Turbomachinery Laboratories, 1996)
The cooperative effort is described of equipment manufacturers,
the process plant designer and the ultimate user to specify and
design a compressor system that was driven by a 10,500 horsepower
induction motor that was ...
Desiccants: Benefits for the Second Century of Air-Conditioning
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1996)
Desiccant technology now stands where mechanical
cooling stood in the 1930's. Desiccant systems have
been used by industrial engineers to achieve
productivity and energy benefits which far outweigh
their installed cost. ...
Data Quality Requirements for Determining Energy Savings in the Weatherization Assistance Program (WAP)
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1996)
This paper briefly describes an ongoing
energy retrofit program, the Weatherization
Assistance Program (WAF') of the Texas
Department of Housing and Community Affairs.
After briefly reviewing the various parameters
that ...
Assessment and Suggestions to Improve the Commercial Building Module of EIA-NEMS
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
The National Energy Modeling System (NEMS) is a comprehensive, computer-based, energy-economy modeling system developed and maintained by the Department of Energy's Energy Information Administration (EIA). NEMS forecasts ...
Operational Performance Evaluation of Boiler 9 at the TAMU Power Plant at College Station, Submitted to the Power Plant of Texas A&M University
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
As part of the engineering assistance project, the ESL staff worked with operating staff at the power plant: (1) to evaluate the boiler efficiency of boiler 9 by using combustion analysis; (2) to evaluate gas and steam ...
Estimated Savings from Turning Off Unnecessary Electrical Loads During Unoccupied Periods at the Langford Architecture Center
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report presents the results of an on-off test conducted to determine the lighting load in the studios on the third and fourth floors of the Langford Architecture Center Building A and the savings that would be achieved ...
Planning, Preparation, And Implementation Of Turbomachinery Turnarounds.
(Texas A&M University. Turbomachinery Laboratories, 1996)
Anyone involved in overhauling equipment during a scheduled
turnaround knows the importance of having the right people and
the right tools available in the right places at the right time.
Obviously, the orchestration ...
Turbine Overhaul Frequency Time Or Performance Based?.
(Texas A&M University. Turbomachinery Laboratories, 1996)
How long should a turbine run before it is disassembled for inspection and overhaul? This question is increasingly important in today's environment of reduced maintenance and turnaround costs. Many aspects of the degradation ...
Options For Low Speed And Operating Speed Balancing Of Rotating Equipment.
(Texas A&M University. Turbomachinery Laboratories, 1996)
Most turbomachinery users refer to bearing vibration as one of
their major indicators of a successful repair. Frequently heard are
such comments as "we could not even tell the machine was
running." The single most ...