Show simple item record

dc.creatorRybkowski, Zofia K.
dc.date.accessioned2015-02-08T23:21:23Z
dc.date.available2015-02-08T23:21:23Z
dc.date.issued2010-07-14
dc.identifier.citationRybkowski, Z. K. (2010). “Last Planner and its role as conceptual kanban,” Proceedings of the 18th Annual Conference of the International Group for Lean Construction, Haifa, Israel, July 14-16, 63-72.en
dc.identifier.urihttps://hdl.handle.net/1969.1/153693
dc.description.abstractHistorically, the Last Planner™ System of Production Control has been coupled with the body of Lean Construction literature. However, the mechanism of the Last Planner and how it fits within accepted lean thinking has not always been apparent. This paper addresses this uncertainty. It examines simulated results from a lean simulation game and argues that the Last Planner serves the role of a conceptual kanban, among its functions—and therefore sits squarely within the domain of Lean theory.en
dc.language.isoen_US
dc.publisherProceedings of the 18th International Group for Lean Construction
dc.rightsCC0 1.0 Universalen
dc.rights.urihttp://creativecommons.org/publicdomain/zero/1.0/
dc.subjectLast Planner, kanban, airplane game, lean constructionen
dc.titleLast Planner and Its Role as Conceptual Kanbanen
dc.typeArticleen
local.departmentConstruction Scienceen


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

CC0 1.0 Universal
Except where otherwise noted, this item's license is described as CC0 1.0 Universal