Show simple item record

dc.creatorSon, Junghye
dc.date.accessioned2012-06-07T22:57:41Z
dc.date.available2012-06-07T22:57:41Z
dc.date.created1999
dc.date.issued1999
dc.identifier.urihttps://hdl.handle.net/1969.1/ETD-TAMU-1999-THESIS-S667
dc.descriptionDue to the character of the original source materials and the nature of batch digitization, quality control issues may be present in this document. Please report any quality issues you encounter to digital@library.tamu.edu, referencing the URI of the item.en
dc.descriptionIncludes bibliographical references (leaves 200-203).en
dc.descriptionIssued also on microfiche from Lange Micrographics.en
dc.description.abstractThe goal of this research was to develop and illustrate a procedure to achieve time- cost optimization for a construction operation by finding the adequate crew configurations. The time-cost relationship in a construction operation was defined to develop the scope of time-cost optimization in this research. Optimization tools, such as neural networks, genetic algorithms, and simulation methods were analyzed to determine an effective tool for the optimization based on the planning and execution phases in construction. An optimization procedure was developed employing ABC-SIM (Activity-Based Costing Simulation), an activity based, Monte Carlo simulation program. The procedure was based on the resource balance point theory. A resource balance point is the point at which the production rates among resources are matched in such a way that unnecessary idling time of a certain resource is eliminated. Also, a validation model was developed to verify that best alternatives, resulted from the suggested optimization procedure, were really optimized for a given operation. 6 network models were used to develop and test the suggested procedure. Also, the procedure was applied to 2 real construction projects, which are Grade Beam Erection Project and Library Project. With the suggested optimization procedure, a construction manager can select the best resource configuration(s), which achieves the optimized time and cost for a given operation.en
dc.format.mediumelectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherTexas A&M University
dc.rightsThis thesis was part of a retrospective digitization project authorized by the Texas A&M University Libraries in 2008. Copyright remains vested with the author(s). It is the user's responsibility to secure permission from the copyright holder(s) for re-use of the work beyond the provision of Fair Use.en
dc.subjectcivil engineering.en
dc.subjectMajor civil engineering.en
dc.titleActivity-based costing simulation as a tool for construction process optimizationen
dc.typeThesisen
thesis.degree.disciplinecivil engineeringen
thesis.degree.nameM.S.en
thesis.degree.levelMastersen
dc.type.genrethesisen
dc.type.materialtexten
dc.format.digitalOriginreformatted digitalen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

This item and its contents are restricted. If this is your thesis or dissertation, you can make it open-access. This will allow all visitors to view the contents of the thesis.

Request Open Access