Abstract
A Georgia-Pacific plywood plant located in Madison, Georgia recently decided to insulate their steam lines for energy conservation, improved process efficiency and personnel protection. The goal of the project was to eliminate dependency on purchased fuel. Georgia-Pacific realized immediate and significant results and reduced fuel cost by about one third over a one year period.
Jackson, D. (1997). Case Study: Georgia-Pacific Reduces Outside Fuel Costs and Increases Process Efficiency with Insulation Upgrade Program. Energy Systems Laboratory (http://esl.tamu.edu). Available electronically from
https : / /hdl .handle .net /1969 .1 /91194.