Search
Now showing items 31-40 of 301
Comparison of ASHRAE Standard 90.1, 189.1 and IECC Codes for Large Office Buildings in Texas
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
Six energy codes were compared in terms of annual site and source energy consumption. This comparison includes ASHRAE Standard 90.1-1989, ASHRAE Standard 90.1-1999, ASHRAE Standard 90.1-2007, ASHRAE Standard 90.1-2010, ...
Case Studies in Using Interval Data Energy Models for Savings Verification: Lessons from the Grocery Sector
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
The use of whole building utility interval data for verifying energy savings from energy efficiency projects has become an attractive option as this data is increasingly available. Formal protocols, such as IPMVP Option C ...
Intelligent Building Control System for EPBD Certification Support
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
Building commissioning is a developing concept also in the Czech Republic. At present time only some aspects of building commissioning are implemented as a part of the facility management and energy auditing processes that ...
Open Control Networking Systems for Smarter Building Operations-Fundamentals of System Architecture and Design
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
LonMark Open Solutions: An Industry Update-New Products, Solutions, Educational Programs, Standards, and how They Affect the Future of Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
Application of CC® at a Corporate Headquarters Facility in Dallas, TX
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
A corporate headquarters complex located in Dallas, TX consists of four buildings served by a central utility plant. The Continuous Commissioning® (CC®) process was applied to one building with approximately 688,000 ...
An Approach to Facilities Operational Improvement
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
MEW Efforts in Reducing Electricity and Water Consumption in Government and Private Sectors in Kuwait
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
Con Edison Commercial and Industrial Energy Efficiency Program
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)
Efficiency Vermont's Enhanced Building Operations Programs
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2011)