Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The Texas LoanSTAR (Loans to Save Taxes
and Resources) program was conceived as a $98.6
million capital retrofit program for building energy
efficiency. The funding source is petroleum
violation escrow funds (PVE) from the ...
Texas LoanSTAR Monitoring and Analysis Program Draft Plan
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1989)
Major objectives of the LoanSTAR Monitoring and Analysis Program
(MAP) are to:
verify energy and dollar savings of energy conservation
retrofits in state, school and local government
buildings;
reduce energy costs by ...
Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume I)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report is Volume I of a two volume set that documents the progress since the January 1991 MARC meeting. This first voume contains photocopies of the ...
Prairie View A&M University Whole Campus Energy Report Update
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1992)
Prairie View A&M University started a large scale energy management program in 1987 and 1988. This
updated report presents an analysis of whole-campus energy consumption at the Prairie View A&M Campus
where whole-campus ...
Improving Building Energy System Performance by Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly ...
U. S. Army Measurement and Verification (M&V) Costing Toolkit
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This is the 2003 final report for the U.S. Army Monitoring and Verification (M&V) costs project. The purpose of this project is to develop a M&V Costing Toolkit to be used by the government or third party planners to design ...
Cool Storage Applications in the Texas LoanSTAR Program: Overview and Preliminary Results
(Energy Systems Laboratory (http://esl.tamu.edu), 1995-03)
Measuring Energy-Saving Retrofits: Experiences from the LoanSTAR Program
(2005-09-27)
In 1988 the Governor's Energy Management Center of Texas received approval from the U.S. Department of Energy to establish a $98.6 million state-wide retrofit demonstration revolving loan program to fund energy-conserving ...
Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. III - Technical Appendix
(2006-10-31)
The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code
Ann. § 388.003 (e), Vernon Supp. 2002, submits its fourth annual report, Energy Efficiency/Renewable
Energy (EE/RE) ...