Search
Now showing items 21-30 of 70
LoanSTAR after 11 Years: A Report on the Successes and Lessons Learned from the LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
The Texas LoanSTAR (Loans to Save Taxes And Resources) Program was established in 1988 by the Texas Governor’s Energy Office (GEO) as a revolving loan program for funding energy conserving retrofits in state and local ...
A Twelve Year, $10 Million Energy Initiative Marching On: the Texas A&M University Campus Energy Systems CC®
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
The $58.5 million in measured savings for the twelve-year, $10 million continuous commissioning®
(CC®) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with ...
Development and Use of Baseline Monthly Utility Models for Eight Army Installations Around the United States
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (USACERL) located in Champaign, IL by the Energy Systems Laboratory (ESL) of Texas A&M University. The first phase of ...
Investigation of PVC Pipe Failure at Terrell State Hospital – Final Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
At the request of Terrell State Hospital and MHMR, the Energy Systems Laboratory at Texas A&M University investigated the failure of the PVC pipes serving the chilled water loop at Terrell State Hospital. There were two ...
Redesign of Lighting Fixtures for the Texas Department of Corrections
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1988)
Over 100 tests of potential design modifications for the cell light
fixtures used by the Texas Department of Corrections have been
conducted. As a result of these tests, the following recommendations
are made:
1. Turn ...
Rebuild America Program – Brazos Valley Energy Conservation Coalition – Quarterly Report for July – September 1998
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
The Brazos Valley Energy Conservation Coalition (BVECC), administered by the Energy Systems Laboratory (ESL) of Texas A&M University, in College Station, Texas received notification of the U.S. Department of Energy ...
Continuous Commissioning® Opportunities in Hospital and Laboratory Facilities
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
This paper compiles the Continuous Commissioning® (CC®) costs, savings, and opportunities implemented in 20 hospital and laboratory commissioning projects involving 48 buildings. The potential savings and costs from 25 CC ...
Development of Baseline Monthly Utility Models for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), 1996-04)
The Fort Hood Army base in central Texas has more than 5,200 buildings and can be considered as typical of large Department of Defense Army bases in the continental United States. The annual utility bill of the base exceeds ...
Room Temperature Control During Season Switchover with Single Duct Variable Air Volume System Without Reheat
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Langford “A” building houses the College of
Architecture on TAMU campus. There are ten singleduct
variable air volume (VAV) air-handling units
(AHUs) without reheat serving the building. The
local pneumatic thermostats ...
A Ten-Year, $7 Million Energy Initiative Marching on: Texas A&M University Campus Energy Systems CC
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
The $35 million in measured savings for the ten-year, $7 million continuous commissioning (CC) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with the ...