Search
Now showing items 11-20 of 37
Commissioning of A Large Office Building in Texas - A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
This case study involves commissioning of a
large office building in the hot and humid climate of
south Texas. The commissioning involved the
installation of a VFD (Variable Frequency Drive) on
a chilled water pump, improved ...
A Method to Determine the Optimal Tank Size for a Chilled Water Storage System Under a Time-of-Use Electricity Rate Structure
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2010)
In the downtown area of Austin, it is planned to build a new naturally stratified chilled water storage tank and share it among four separated chilled water plants. An underground piping system is to be established to ...
A Twelve Year, $10 Million Energy Initiative Marching On: the Texas A&M University Campus Energy Systems CC®
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
The $58.5 million in measured savings for the twelve-year, $10 million continuous commissioning®
(CC®) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with ...
Investigation of PVC Pipe Failure at Terrell State Hospital – Final Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
At the request of Terrell State Hospital and MHMR, the Energy Systems Laboratory at Texas A&M University investigated the failure of the PVC pipes serving the chilled water loop at Terrell State Hospital. There were two ...
Continuous Commissioning® of the Dallas/Fort Worth International Airport
(Energy System Laboratory (http://esl.tamu.edu), 2008-10)
The DFW International Airport is one of the largest and busiest airports in the world. Located in North Texas, squarely between the cities of Dallas and Fort Worth, the DFW Airport not only serves a huge population in ...
Continuous Commissioning® Opportunities in Hospital and Laboratory Facilities
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
This paper compiles the Continuous Commissioning® (CC®) costs, savings, and opportunities implemented in 20 hospital and laboratory commissioning projects involving 48 buildings. The potential savings and costs from 25 CC ...
Chilled Water System Hydraulic Study for The University of Texas at San Antonio
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
The University of Texas at San Antonio needs to expand their central chilled water distribution system as a result of planned additions to the
campus. The current distribution system may be inadequate for the planned ...
The Chilled Water and Hot Water Building Differential Pressure Setpoint Calculation - Chilled Water and Hot Water Pump Speed Control
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
More and more variable frequency devices (VFD)
are being installed on the chilled water and hot water
pumps on the TAMU campus. Those pump speeds
are varied to maintain chilled water or hot water
building deferential ...
Room Temperature Control During Season Switchover with Single Duct Variable Air Volume System Without Reheat
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Langford “A” building houses the College of
Architecture on TAMU campus. There are ten singleduct
variable air volume (VAV) air-handling units
(AHUs) without reheat serving the building. The
local pneumatic thermostats ...
A Ten-Year, $7 Million Energy Initiative Marching on: Texas A&M University Campus Energy Systems CC
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
The $35 million in measured savings for the ten-year, $7 million continuous commissioning (CC) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with the ...