Search
Now showing items 171-178 of 178
Signatures of Heating and Cooling Energy Consumption for Typical AHUs
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
An analysis is performed to investigate the
signatures of different parameters on the heating
and cooling energy consumption of typical air
handling units (AHUs). The results are presented
in graphic format. HVAC simulation ...
Measuring Energy-Saving Retrofits: Experiences from the LoanSTAR Program
(2005-09-27)
In 1988 the Governor's Energy Management Center of Texas received approval from the U.S. Department of Energy to establish a $98.6 million state-wide retrofit demonstration revolving loan program to fund energy-conserving ...
Commissioning Lessons from Study of the Advanced Systems at the CMU Intelligent Workplace
(2008-04)
A detailed study has been conducted of the performance of several innovative aspects of the Intelligent Workplace (IW) at Carnegie Mellon University, a low energy consumption building that uses radiant heating, cooling and ...
A Follow-up Study on the Persistence of Savings from the Retrocommissioning of Ten Buildings on a University Campus: Preliminary Results
(2007-09-11)
A study has been initiated to provide follow-up analysis on the persistence of savings achieved from the retrocommissioning of ten buildings on a university campus. The buildings were originally commissioned in 1996, and ...
Sustainability Assessment and Roadmap for a Green Campus Initiative
(Energy Systems Laboratory, 2006-10)
Texas A&M International University and the Energy Systems Laboratory of the Texas
Engineering Experiment Station have partnered to conduct a campus sustainability assessment
and create a subsequent campus sustainability ...
Lessons and Measures Learned from Continuous Commissioning(SM) of Central Chilled/Hot Water Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
As it has been proved repeatedly that
commissioning is very necessary for new construction
and renovation/retrofit projects, we found continuous
commissioningSM (CC) is an effective and efficient
way to manage and optimize ...
Using Simulation Models for Building Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The International Energy Agency ECBCS Annex 40 “Commissioning of Buildings and HVAC
Systems for Improved Energy Performance” task investigating Use of Whole Building Simulation in
Commissioning has identified the following ...
The Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume II)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report
is Volume II of a two volume set that documents the progress since the January 1991
MARC meeting.
This second volume contains papers and ...