Search
Now showing items 1-10 of 23
Calculating Energy and Demand Retrofit Savings for Stroman High School: Interim Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1992)
As part of the LoanSTAR program, Stroman High School in Victoria Texas underwent
two retrofits: a) an absorption chiller was changed to an electric vapor compression
chiller, and b) an EMCS system was installed after ...
Calculating Energy and Demand Retrofit Savings for Victoria High School: Interim Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1992)
As part of the LoanSTAR program, Victoria High School in Victoria, Texas underwent
two retrofits: a) an absorption chiller was changed to an electric vapor compression
chiller, and b) an EMCS system was installed after ...
Potential Operation and Maintenance (O&M) Savings at Schools in the Ft. Worth Independent School District
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
As part of the Texas LoanSTAR program, 44 schools in the Fort Worth Independent
School District (FWISD) had lighting retrofits performed on there in late 1991. The
Energy Systems Laboratory of Texas A&M University is ...
Potential Operation and Maintenance (O&M) Savings in the Basic Science Building at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report presents the results of a study of the potential energy savings due to optimizing the Heating, Ventilation and Air Conditioning (HVAC) operation schedule in the Basic Science Building at University of Texas ...
Summary of UTMB O&M Project: Energy Conservation Potential in Five Buildings
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report is a summary of five reports (references 1 to 5) which provided detailed
descriptions of an O&M investigation of the following five buildings on the UTMB
campus: 1) John Sealy North Building(JSN); 2) Clinical ...
Data Polling Routine (PlotHood) to Generate Weekly Inspection Plots for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (CERL) located at Champaign, IL. The report describes the work performed by the Energy Systems Laboratory (ESL) of ...
Using Fourier Series to Model Hourly Energy Use in Commercial Buildings
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
Fourier series analysis is eminently suitable for modeling strongly periodic data. Weather independent energy use such as lighting and equipment load in commercial buildings is strongly periodic and is thus appropriate for ...
Development and Use of Baseline Monthly Utility Models for Eight Army Installations Around the United States
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (USACERL) located in Champaign, IL by the Energy Systems Laboratory (ESL) of Texas A&M University. The first phase of ...
Potential Operation and Maintenance (O&M) Savings in the John Sealy North Building at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
The LoanSTAR Monitoring and Analysis Group, Energy Systems Laboratory at Texas A&M University, was requested by University of Texas Medical Branch at Galveston to investigate O&M measures in their five LoanSTAR program ...
An Overview of Measured Energy Retrofit Savings Methodologies Developed in the Texas LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
Development of methodologies to determine energy retrofit savings in commercial buildings (institutional buildings, schools, hospitals, offices, county and state buildings,...) has been the object of active research during ...