Search
Now showing items 31-37 of 37
Maximizing Commercial Hydraulic Software Simulation in Thermal Distribution System Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
Shut Down Schedule Optimization with Outdoor Humidity Level
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Continuous Commissioning® of the Matheson Courthouse in Salt Lake City, Utah
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Utah Energy Office, located in the Department
of Natural Resources (DNR), Utah Department of
Facilities Construction and Management (DFCM),
and engineers from the Energy Systems Laboratory at
Texas A&M University teamed ...
Rehabilitation of Secondary Heating and Cooling Systems - Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Continuous Commissioning (CCSM) was performed
on the Texas A&M Large Animal Hospital in
October 1996 and as a result, significant savings were
achieved. Subsequently, the building chilled water
and hot water energy consumption ...
Continuous Commissioning of a Central Chilled Water & Hot Water System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
A central chilled water / hot water system
provides cooling / heating energy from central utility
plants to multiple customers (buildings) through
campus distribution loops. To effectively transport
the chilled water and ...
Optimization Measures for Sporting and Special Event Facilities: Design and Operation
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
Reducing unnecessary building energy costs
is becoming more of a priority. Rising fuel
prices and a global emphasis on energy
efficiency are key contributing factors. This
push towards energy efficiency certainly applies
to ...
Lessons and Measures Learned from Continuous Commissioning(SM) of Central Chilled/Hot Water Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
As it has been proved repeatedly that
commissioning is very necessary for new construction
and renovation/retrofit projects, we found continuous
commissioningSM (CC) is an effective and efficient
way to manage and optimize ...