Search
Now showing items 151-160 of 236
Compilation of Diversity Factors and Schedules for Energy and Cooling Load Calculations, Phase II Report - Identified Relevant Data Sets, Methods, and Variability Analysis
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
This is the second report of the ASHRAE 1093-RP project that reports on the progress during the scheduled Phase II effort. In this report, we present: (1) the data sets identified and acquired required for the analysis; ...
Sample M&V Plan from the Texas Workshop: Preparing and Evaluating Measurement and Verification Plans for Energy Performance Contracts in Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
This document contains a sample M&V plan that has been prepared in accordance with the Texas Guidelines for Measurement and Verification for Energy Performance Contracts. This sample M&V plan was extracted from the March ...
Comfort Conditions in a Habitat for Humanity House in Central Texas
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
This paper presents preliminary results of an
analysis of measured comfort conditions for a Habitat
for humanity house in central Texas. In the case
study house indoor-outdoor temperature, humidity
and C02 levels have been ...
Texas' Senate Bill 5 Legislation for Reducing Pollution in Non-Attainment and Affected Areas: Procedures for Measuring Electricity Savings from the Adoption of the International Energy Conservation Code (IRC/IECC 2001) in New Residences
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Four areas in Texas have been designated by the
EPA as non-attainment areas because ozone levels
exceed the NAAQS maximum allowable limits,
Beaumont-Port Arthur, El Paso, Dallas-Ft. Worth,
and Houston-Galveston-Brazoria. ...
Data Visualization for Quality-Check Purposes of Monitored Electricity Consumption in All Office Buildings in the ESL Database
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
This report comprises an effort to visualize the monitored electricity consumption in all office buildings (not including the office buildings comprising other functions as classrooms and laboratories, for instance) in the ...
Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests; Literature Review, Preliminary Methodology Description, and Final Site Selection (Final Revision of Nov. 1997 Report)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
This preliminary report contains the literature review, a preliminary description of the methodologies that have been chosen for the project and final site selection recommendations for ASHRAE Research Project RP 1004 ~ ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was conceived as a $98.6 million capital retrofit program for building energy efficiency. The funding source is petroleum violation escrow funds (PVE) from the ...
Procedure to Calculate NOx Reductions Using the Emissions & Generation Resource Integrated Database (E-Grid) Spreadsheet
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
In this report a detailed description of the procedure to calculate NOx reductions from energy savings due to the 2000 IECC code implementation in single family residences using the United States Environmental Protect ...
Energy Analysis, Baselining and Modeling of Prairie View A&M University
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
Analysis of the available data found that electricity savings in the J.B. Coleman Library for June - September, 1998 were 298 MWh, or 38% of the baseline consumption during these months. Extrapolation of these savings to ...
The USDOE Forrestal Building Lighting Retrofit: Preliminary Analysis of Electricity Savings
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
In September of 1993 a 36,832 fixture lighting retrofit was completed at the United States Department of Energy Forrestal complex in Washington, D.C. This retrofit represents DOE's largest project to date that utilizes a ...