Show simple item record

dc.creatorDeslex, Lauris
dc.date.accessioned2012-06-07T22:55:18Z
dc.date.available2012-06-07T22:55:18Z
dc.date.created1999
dc.date.issued1999
dc.identifier.urihttps://hdl.handle.net/1969.1/ETD-TAMU-1999-THESIS-D47
dc.descriptionDue to the character of the original source materials and the nature of batch digitization, quality control issues may be present in this document. Please report any quality issues you encounter to digital@library.tamu.edu, referencing the URI of the item.en
dc.descriptionIncludes bibliographical references (leaves 184-191).en
dc.descriptionIssued also on microfiche from Lange Micrographics.en
dc.description.abstractConstructibility has been defined as "the optimum use of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives.'' ("Constructability: a Primer'' 1986). This thesis focuses on constructibility issues for construction of bridge foundations in waterways. Four major types of foundation are typically used for bridges: spread footings, driven piles, drilled shafts, and auger piles. Each type of foundation has specific characteristics, described in this thesis, along with the methods of construction. Once the decision of which foundation should be used has been determined by structural and geotechnical engineers, the project is turned over to project management. At this point, a constructibility analysis should begin. For this purpose, a constructibility diagram has been developed to encompass issues that need to be considered before construction starts in order to enhance job site operations. A questionnaire, sent to a set of experts in bridge foundation construction in the United States and France, revealed that construction in waterways involves particular issues that are essentially known by experienced project managers only. For this reason, a framework for a decision support tool for constructibility analysis of bridge foundation in waterways has been developed to keep this knowledge available for future projects. The concept on which the framework is based consists of a computerized constructibility database using an expert system type of queries, with hypermedia and hypertext for usability. The aim of this decision tool would be to retrieve any past experience relevant to a particular project, in the specific area of interest of the user.en
dc.format.mediumelectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherTexas A&M University
dc.rightsThis thesis was part of a retrospective digitization project authorized by the Texas A&M University Libraries in 2008. Copyright remains vested with the author(s). It is the user's responsibility to secure permission from the copyright holder(s) for re-use of the work beyond the provision of Fair Use.en
dc.subjectcivil engineering.en
dc.subjectMajor civil engineering.en
dc.titleConstructability analysis of bridge pier foundations in waterwaysen
dc.typeThesisen
thesis.degree.disciplinecivil engineeringen
thesis.degree.nameM.S.en
thesis.degree.levelMastersen
dc.type.genrethesisen
dc.type.materialtexten
dc.format.digitalOriginreformatted digitalen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

This item and its contents are restricted. If this is your thesis or dissertation, you can make it open-access. This will allow all visitors to view the contents of the thesis.

Request Open Access