NOTE: Restrictions are in place to limit access to one or more of the files associated with this item. Authorized users must log in to gain access. Non-authorized users do not have access to these files.
Visit the Energy Systems Laboratory Homepage.
SECO - Dow Corning's Wood Fueled Industrial Cogeneration Project
Abstract
In 1979, Dow Corning Corporation decided to build a wood fueled steam and electric cogeneration (SECO) power plant at Midland, Michigan. This decision was prompted by the high cost of oil and natural gas, an abundant supply of wood in mid Michigan and the fuel efficiency inherent in cogeneration. Construction commenced in March of 1980 and plant operation will begin during the 4th quarter of 1982. The primary fuel will be wood in the form of chips. Three-quarters of the wood will come from nearby forest lands. The remainder will come from sawmill, urban and industrial residue. To assure the necessary supply of wood fuel, Dow Corning has assembled a natural resource team of professional foresters and wildlife biologists. This team will plan and administer a sound, sensitive forest/ wildlife management program, consisting of segments which are tailored to meet the specific needs of the individual landowners. The benefits of the SECO program for Dow Corning include economical fuel and fuel conservation through cogeneration, and for the mid-Michigan area, increased woodlot productivity, healthier forests, more wildlife and increased employment and economic activity.
Collections
Citation
Betts, W. D. (1982). SECO - Dow Corning's Wood Fueled Industrial Cogeneration Project. Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu). Available electronically from https : / /hdl .handle .net /1969 .1 /94331.