Abstract
A number of new energy efficient (EE) motors have been installed at the Port Neches SBR plant in the past few years. Some of these installations presented many problems. The measurement of dollars saved has been difficult. Easy installations with good payback are described along with some horrible examples.
Riley, J. C.; Comiskey, W. T (1985). Case Histories of Energy Efficient Motors. Energy Systems Laboratory (http://esl.tamu.edu). Available electronically from
https : / /hdl .handle .net /1969 .1 /93299.