Search
Now showing items 1-10 of 28
Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 1 (Edinburg) - North Branch / East Main - Final
(Texas Water Resources Institute, 2003-10)
Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 1 to the Bureau ...
Economic Implications of Biological Control of Arundo donax in the Texas Rio Grande Basin
(Texas Water Resources Institute, 2009-11)
ABSTRACT
Arundo donax, or giant reed, is a large, bamboo-like plant that is native to Spain and has invaded
several thousand acres of the Rio Grande riparian zone in Texas and Mexico. The plant grows to
over 26 feet ...
Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 1 (Edinburg) - Curry Main - Final
(Texas Water Resources Institute, 2003-09)
Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 1 to the Bureau ...
Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Preliminary
(Texas Water Resources Institute, 2004-01)
Initial construction costs and net annual changes in operating and maintenance expenses
are identified for a capital renovation project proposed by Maverick County Water Control and
Improvement District No. 1 to the ...
An Overview of Operational Characteristics of Selected Irrigation Districts in the Texas Lower Rio Grande Valley: Hidalgo County Irrigation District No. 2 (San Juan)
(Texas Water Resources Institute, 2005-04)
Population expansion and water shortfalls have placed the Texas Lower Rio
Grande Valley (Valley) center stage in water publicity. The unique characteristics and
lack of public knowledge on how irrigation districts divert ...
Economic Methodology for South Texas Irrigation Projects - RGIDECON
(Texas Water Resources Institute, 2002-10)
A mathematical discourse is provided, documenting the economic and financial methods used in RGIDECON, an Excel spreadsheet capital investment evaluation model focused on irrigation district-level pumping and delivery ...
Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Infrastructure Rehabilitation – Preliminary
(Texas Water Resources Institute, 2003-07)
Initial construction costs and net annual changes in operating and maintenance expenses are identified for a five-component capital renovation project proposed by Cameron County Irrigation District No. 2, (a.k.a. San Benito) ...
Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Final
(Texas Water Resources Institute, 2004-04)
Initial construction costs and net annual changes in operating and maintenance expenses
are identified for a capital renovation project proposed by Maverick County Water Control and
Improvement District No. 1 to the ...
Expected Economic Benefits of the El Morillo Drain
(Texas Water Resources Institute, 2007-01-02)
The study of the benefits (damages averted) attributable to the El Morillo Drain
encompasses U.S. municipalities, industry, and agriculture. It is conservatively estimated
that the annual direct benefits to residents of ...