Abstract
At the 2002 IETC, we described the benefits of a site-wide utility system simulation model that can translate all in-plant process modifications to the resulting changes in fuel, water and electricity at the factory fence to ensure that process BTUs are a
Fernandez-Polanco, D.; Eastwood, A.; Knight, N. (2004). Real-Time Utility System Optimization. Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu). Available electronically from
https : / /hdl .handle .net /1969 .1 /6049.