Abstract
The U.S. Army Construction Engineering Research Laboratory (CERL) and Energy Technology Services International, Inc. (ETSI) have developed a process optimization methodology and supporting tools to conduct comprehensive facility and process energy and emi
Lin, M.; Vavrin, J.; Smith, W. (2004). Process Optimization Assessments at Fort Leonard Wood, Missouri and Fort Carson, Colorado. Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu). Available electronically from
https : / /hdl .handle .net /1969 .1 /6025.