Show simple item record

dc.contributor.advisorMalave, Cesar O.
dc.creatorShim, Young Hak
dc.date.accessioned2007-09-17T19:37:31Z
dc.date.available2007-09-17T19:37:31Z
dc.date.created2003-05
dc.date.issued2007-09-17
dc.identifier.urihttps://hdl.handle.net/1969.1/5905
dc.description.abstractThis dissertation presents the configuration and capacity management of manufacturing cells using cluster analysis. A heuristic based on cluster analysis is developed to solve cell formation in cellular manufacturing systems (CMS). The clustering heuristic is applied for cell formation considering processing requirement (CFOPR) as well as various manufacturing factors (CFVMF). The proposed clustering heuristic is developed by employing a new solving structure incorporating hierarchical and non-hierarchical clustering methods. A new similarity measure is constructed by modifying the Jarccard similarity and a new assignment algorithm is proposed by employing the new pairwise exchange method. In CFOPR, the clustering heuristic is modified by adding a feedback step and more exact allocation rules. Grouping efficacy is employed as a measure to evaluate solutions obtained from the heuristic. The clustering heuristic for CFOPR was evaluated on 23 test problems taken from the literature in order to compare with other approaches and produced the best solution in 18 out of 23 and the second best in the remaining problems. These solutions were obtained in a considerably short time and even the largest test problem was solved in around one and a half seconds. In CFVMF, the machine capacity was first ensured, and then manufacturing cells were configured to minimize intercellular movements. In order to ensure the machine capacity, the duplication of machines and the split of operations are allowed and operations are assigned into duplicated machines by the largest-first rule. The clustering heuristic for CFVMF proposes a new similarity measure incorporating processing requirement, material flow and machine workload and a new machine-part matrix representing material flow and processing time assigned to multiple identical machines. Also, setup time, which has not been clearly addressed in existing research, is discussed in the solving procedure. The clustering heuristic for CFVMF employs two evaluation measures such as the number of intercellular movements and grouping efficacy. In two test problems taken from the literature, the heuristic for CFVMF produced the same results, but the trade-off problem between the two evaluation measures is proposed to consider the goodness of grouping.en
dc.format.extent390394 bytesen
dc.format.mediumelectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherTexas A&M University
dc.subjectCluster analysisen
dc.subjectCell formationen
dc.titleDesign of a cluster analysis heuristic for the configuration and capacity management of manufacturing cellsen
dc.typeBooken
dc.typeThesisen
thesis.degree.departmentIndustrial and Systems Engineeringen
thesis.degree.disciplineIndustrial Engineeringen
thesis.degree.grantorTexas A&M Universityen
thesis.degree.nameDoctor of Philosophyen
thesis.degree.levelDoctoralen
dc.contributor.committeeMemberBanerjee, Amarnath P.
dc.contributor.committeeMemberHsieh, Sheng-Jen "Tony"
dc.contributor.committeeMemberNtaimo, Lewis
dc.type.genreElectronic Dissertationen
dc.type.materialtexten
dc.format.digitalOriginborn digitalen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record