Visit the Energy Systems Laboratory Homepage.
dc.creator | Ginestet, S. | |
dc.creator | Marchio, D. | |
dc.creator | Morisot, O. | |
dc.date.accessioned | 2007-04-27T16:43:57Z | |
dc.date.available | 2007-04-27T16:43:57Z | |
dc.date.issued | 2004 | |
dc.identifier.other | ESL-IC-04-10-56 | |
dc.identifier.uri | https://hdl.handle.net/1969.1/5084 | |
dc.description.abstract | Several tools in the scope of Annex 40 (PECI Model Commissioning Plan and Guide specification, Emma-CTA, IPMVP) have been used to realise the retro and the on-going commissioning of an existing building. The aim of the work was to evaluate operability, consumed time, results of these tools used by HVAC operation technicians. Analysis of making use of the different tools in a common framework is proposed, giving feedback information to creative authors. | en |
dc.format.extent | 93642 bytes | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | en_US | |
dc.publisher | Energy Systems Laboratory (http://esl.tamu.edu) | |
dc.publisher | Texas A&M University (http://www.tamu.edu) | |
dc.subject | retro-commissioning | en |
dc.subject | on-going commissioning | en |
dc.subject | tools | en |
dc.subject | operability on existing buildings | en |
dc.title | Operability and Results of Retro and On-Going Commission Tools Applied to an Existing Building | en |
This item appears in the following Collection(s)
-
ICEBO - International Conference for Enhanced Building Operations
International Conference for Enhanced Building Operations