Search
Now showing items 1-10 of 10
Actionable Information - Research Briefs - 4 - Literature Review on the Impact of Natural Threats on Supply Chains
(Stochastic Geomechanics Laboratory, 2021-05-11)
A literature review was conducted in order to identify the most impactful effects of natural hazards on the operation of supply chains. The review considered the body of research produced about this topic including the ...
Website of R7 - Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure
(Stochastic Geomechanics Laboratory, 2021-09-01)
Home page screen capture of the website dedicated to the R7 project: Model Development for Risks posed by COVID-19 on U.S. Trade Supply Chain Infrastructure. The milestones of the project are: 1. To generate a risk-guided ...
R7 - Internal Report on Bayesian Risk Assessment & Management Model Development V0.0
(Stochastic Geomechanics Laboratory, 21-Feb)
Internal report on the development steps for a Risk Assessment and Management model using Bayesian Networks. The objectives of the model include: mapping qualitatively participating processes needed to simulate prognosis ...
R13-CBTS-SGL Monthly Risk Bulletin February 2021
(Stochastic Geomechanics Laboratory, 2021-03-03)
The objective of the Monthly Risk-Bulletin is to provide an overview a) of lessons learned during the past month in the project, b) of a score-card-type system to communicate the state of risk of supply ...
R13-CBTS-SGL Monthly Risk Bulletin March 2021
(Stochastic Geomechanics Laboratory, 2021-04-14)
The objective of the Monthly Risk-Bulletin is to provide an overview a) of lessons learned during the past month in the project, b) of a score-card-type system to communicate the state of risk of supply ...
R7 - Internal Report on Bayesian Risk Assessment & Management Model Development V1.0
(Stochastic Geomechanics Laboratory, 2021-05-24)
The version 0.0 of the Bayesian Networks (BN) model was updated to include variables and processes identified during the development of R7 project, guided by the variables present in Social Vulnerability Indexes from both ...
R13-CBTS-SGL Monthly Risk Bulletin October 2020
(Stochastic Geomechanics Laboratory, 2020-11-03)
The objective of the Monthly Risk-Bulletin is to provide an overview a) of lessons learned during the past month in the project, b) of a score-card-type system to communicate the state of risk of supply ...
R13-CBTS-SGL Monthly Risk Bulletin September 2020
(Stochastic Geomechanics Laboratory, 2020-10-26)
The objective of the Monthly Risk-Bulletin is to provide an overview a) of lessons learned during the past month in the project, b) of a score-card-type system to communicate the state of risk of supply ...
Evaluación y Administración del Estado de Riesgo de las Cadenas de Suministro por COVID-19 entre México y Estados Unidos: Presentación y Mesa Panel
(Stochastic Geomechanics Laboratory, 2021-05-20)
During this presentation, members of the Stochastic Geomechanics Laboratory at Texas A&M University presented their work of two different research projects. The projects, hosted at the Center Of Excellence CBTS are related ...
Actionable Information - Research Briefs - 5 - Summary and Assessment of Weather Information Services
(Stochastic Geomechanics Laboratory, 2021-05-11)
This research brief includes a summary of various weather information services, detailing the procedures followed to obtain and generate data, and a breakdown of the information provided. Based on this information, the ...