Now showing items 1-2 of 2

    • Haberl, J. S.; Smith, L.; Kreider, J. F. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1988)
      Recent reports have highlighted a lower than expected level of understanding by some consulting engineers and building operators concerning how to systematically track operation and maintenance problems and provide consistent ...
    • Khattar, M.; Brandemuehl, M. J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1996)
      Increased outside ventilation air requirements demand special attention to how that air will be conditioned. In winter, the incoming air may need preheating; in summer. the mixed air may be too humid for effective ...