Now showing items 1-3 of 3

    • Haberl, J. S.; Lewis, T.; Im, P.; Carlson, K. A.; Underwood, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)
      This paper discusses the development of a M&V Costing Toolkit that has been developed to assist the U.S. Army with the standardization of costing procedures for measuring and verifying energy savings from Energy Service ...
    • Haberl, J. S.; Liu, Z.; Baltazar-Cervantes, J. C.; Lynn, B.; Underwood, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)
      Fort Hood has selected an Energy Services Performance Contract (ESPC) contractor to help achieve its energy reduction goals as mandated by Executive Order. This ESPC is expected to be a $3.8 million, 20 year contract, which ...
    • Underwood, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1990)
      Diagnostics of heating, ventilating, and air-conditioning (HVAC) systems is becoming increasingly important because of the rising cost of operation and maintenance of HVAC systems. At the same time, computer costs are ...