Now showing items 1-3 of 3

    • Luskay, L.; Haasl, T.; Schwab, J.; Beattie, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)
      Portland Energy Conservation Incorporated (PECI) in conjunction with the National Renewable Energy Laboratory (NREL) staff performed an Assessment of Load and Energy Reduction Techniques (ALERT) retrocommissioning evaluation on ...
    • Luskay, L.; Haasl, T.; Irvine, L.; Frey, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2002)
      Commissioning of existing buildings, or “retrocommissioning” is a systematic process to identify operational and maintenance (O&M) improvements that optimize building performance and ensure that building systems function ...
    • Haasl, T.; Potter, A.; Irvine, L. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2001)
      It is possible to save thousands of dollars in energy costs through a few low-cost operational adjustments but those opportunities are often hidden. Retrocommissioning is a systematic investigation process for improving ...