Continuous Commissioning® Leading Energy Project Process - An Industry Approach
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
Continuous Commissioning® of an Office Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
Optimizing HVAC Control to Improve Building Comfort and Energy Performance
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
This paper demonstrates the benefits of optimal
control in well-designed and operated buildings using
a case study. The case study building was built in
2001. The HVAC and control systems have been
installed with ...
Impacts of Water Loop Management on Simultaneous Heating and Cooling in Coupled Control Air Handling Units
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
The impacts of the water loop management
on the heating and cooling energy consumption
are investigated by using model simulation. The
simulation results show that the total thermal
energy consumption can be increased by ...
Application of Innovative Technologies During Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
This paper demonstrates the implementation of
new innovative technologies during continuous
commissioning practices to improve building
operations and reduce energy costs. A 30-year-old
typical commercial building with a ...
CCLEP Retrofit and Innovative Controls to Achieve 56% Energy Savings for a Luxury Shopping Mall
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2007)
The Continuous Commissioning Leading Project (CCLEP) process is an ongoing process to apply Continuous Commissioning (CC) system optimization theory and advanced technologies in commercial retrofit projects. The CCLEP ...